Installation of the Mains Distribution Board 200-PL1
1. Carefully place the new Mains Distribution board on the Generator chassis. Ensure that the holes for
the four bolts line up with the four threads on the Generator chassis.
2. Attach the four bolts (1) (7 mm allen wrench) to secure the Mains Distribution board to the Generator
chassis.
3. Connect all the cables to the new Mains Distribution board as summarized in the diagram and table
below.
Connec-
tor Label
XJ1
8 mm open ended wrench
XJ2
8 mm open ended wrench
XJ3
8 mm open ended wrench
XJ4
8 mm open ended wrench
XJ6
8 mm open ended wrench
XJ7
8 mm open ended wrench
XJ8
8 mm open ended wrench
XJ9
8 mm open ended wrench
XJ10
XJ11
XJ12
XJ13
XJ14
TR1 - 5
8 mm open ended wrench
TR1 - 0
8 mm open ended wrench
JC-DR-A-411.fm
Service Information and Procedures Class A 2385072-16-8EN
Tool
N/A
N/A
N/A
N/A
N/A
Job Card D/R A411 - Mains Distribution Board 200-PL1
Description of cable
(usually identified by code on a white label)
XJ1
Two cables: XJ2
XJ3
XJ4
XJ6
XJ7
XJ8
XJ9
XJ10/PL1 2111145
200 PL1 XJ1
Empty
Empty
Empty
SEL
0V
Page no. 1605
Senographe DS
1
Cable
color
Brown
Brown
Brown
Brown
Brown
Brown
Brown
Brown
White
Gray
N/A
N/A
N/A
Brown
Brown
Chapter 9