GE Senographe DS Manual page 1074

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card TSG A020 - Generator Power-Up Sequence Flow Charts
2-5
Keep–Alive Voltage Checks on 200PL1
Check that the Generator mains supply switch S1 is closed ("1" position)
and that no attempt has been made to power on the Generator.
No
200PL1: voltage
between PT1 and
No
PT2 at 12 V?
Yes
200PL1 DE2 Faulty.
No
200PL1: voltage
between PT2 and
No
PT3 at 12 V?
Yes
200PL1 DE2 Faulty.
200PL1 F1 OK?
Yes
200PL1: Disconnect XJ14
200PL1 DE3
and DE2 lit?
Yes
200PL1:Re-connect XJ14
200PL2: Disconnect XJ2
200PL1 DE3
and DE2 lit?
Yes
See
Keep–Alive
Voltage Checks on
200PL2 on page
1076.
Chapter 9
Keep–alive voltage checks on 200PL1
200PL1 DE9 lit?
200PL1 DE8 lit?
Yes
200PL1 DE2 lit?
Yes
200PL1 F3 OK?
200PL1 DE3 lit?
Yes
See
Keep–Alive
Voltage Checks on
200PL2 on page
Change 200PL1 F3.
No
See
Keep–Alive
Voltage Checks on
C
200PL2 on page
No
Cable bundle between
(including connectors)
No
No
Replace the cable bundle between
200PL1 connector XJ14 and
200PL2 connector XJ2.
Service Information and Procedures Class A 2385072-16-8EN
No
Yes
200PL1: voltage
between PT15 and
PT12 at 8 V?
Yes
200PL1 DE3 Faulty.
No
200PL1: voltage
between PT12 and
No
PT14 at – 8 V?
No
Yes
200PL1 DE8 Faulty.
Change 200PL1 F3.
200PL1: Disconnect XJ15
200PL1 DE8
and DE9 lit?
200PL1:Re-connect XJ15
200PL1: Disconnect XJ14
200PL1 DE8
and DE9 lit?
Yes
200PL1 XJ14 and
Yes
200PL2 XJ2 OK?
Change 200PL2.
Replace the cable bundle between
Page no. 1074
No
200PL1 DE8 lit?
No
Yes
200PL1 F3 OK?
C
No
Yes
No
Cable bundle between
(including connectors)
200PL1 XJ15 and
No
200PL2 XJ4 OK?
200PL1 connector XJ15 and
200PL2 connector XJ4.
Senographe DS
Yes
No
Yes
Change 200PL1 F3.
Yes
Change 200PL2.
JC-TSG-A-020.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents