GE Healthcare
Revision 1
Job Card D/R A247 - Motorized Compression Brake
1
SUPPLIES
Motorized Compression Brake
2
TOOLS
•
Standard Tool Box
•
Mammography compression scale with digital display
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 45 minutes
4
SAFETY PRECAUTIONS
WARNING
The Gantry must be powered on, mark it clearly with a warning sign to prevent others from
applying commands.
5
PREREQUISITES
•
Rotate the arm to 90° for access to the Motorized
Compression Brake (1).
•
Switch off the Gantry power.
•
Remove the Compression Arm covers (refer to
Card PHY A044 - Remove/Reinstall Gantry Covers
on page
523).
JC-DR-A-247.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A247 - Motorized Compression Brake
Job
Page no. 1309
1
View from the right of the Gantry
Senographe DS
Chapter 9
Chapter 9
Need help?
Do you have a question about the Senographe DS and is the answer not in the manual?