Reassembly of New UPS Unit on V1/V2 Control Stations
1. Put the new UPS unit (1) inside the Control Station.
3
1
4
2
2. Attach the four screws (2) (two on both side - 5 mm allen wrench) to secure the UPS to the Control
Station frame.
3. Connect the ground cable (3) (small screwdriver) to the top of the new UPS rear panel.
4. Connect all the power cables back to the new UPS rear panel.
5. Connect the communications cable (4) to the back of the new UPS rear panel.
6. The battery plug to the UPS is not connected at delivery time. Firmly connect the battery plug (6) to
the battery on the newly installed UPS as shown below.
UPS battery disconnected at delivery time
JC-DR-A-331.fm
Service Information and Procedures Class A 2385072-16-8EN
Connect UPS battery as shown below