GE Senographe DS Manual page 982

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card DIAG A001 - AWS Sun-VTS Diagnostics
11-2-2 Full Tests without Cable on V3 Control Stations
1. Power up the system and wait for the console login: prompt on the AWS monitor.
2. Login as root as follows:
a. At the console login: prompt, login as root by entering:
root
b. When requested to specify the root password by entering:
operator
3. A list of start up messages appear, while the ADS Computer boots up. Wait for the following mes-
sage to appear:
*********************************************
* UPS Communication not established
*
System will shutdown
*********************************************
4. Stop the UPS daemon, by entering:
/etc/rc2.d/S99PBEAgent stop
5. Once the UPS has stopped, remove the UPS cable from Slot #2 of PCI1 of the AWS Computer.
6. Plug a
Standard RS-232 Loopback Adapter
7. Run the test from the command line, by entering:
tip /dev/term/3
The system answers Connected.
8. Type some alphanumeric characters on the keyboard. If the board is good, they are echoed immedi-
ately on the screen
9. To exit the test, type the command:
<Return>~.
Note: It can be necessary to repeat the sequence several times.
10. Once the test is complete reconnect the UPS cable to Slot #2 of PCI1of the AWS Computer.
11. Restart the UPS from the command line, by entering:
ups start
11-3 Full Test with Cable
SUN VTS
Type of test:
11-3-1 Full Tests with Cable on V1/V2 Control Stations
1. Power up the system and wait for the console login: prompt on the AWS monitor.
2. Within 20 seconds of seeing the login prompt, stop the UPS daemon by doing the following:
a. At the console login: prompt, login as root by entering:
root
b. When requested to specify the root password, enter:
operator
c. Stop the UPS daemon, by entering:
ups stop
3. Once the UPS has stopped, remove the UPS cable from the serial port of the UPS.
4. Plug a loopback connector
5. Run the test from the command line, by entering:
/opt/SUNWvts/bin/sptest –v -f -o dev=se0,L=P,T=b
Chapter 9
Service Information and Procedures Class A 2385072-16-8EN
into Slot #2 of PCI1 on the AWS Computer.
"Connector-Loopback
Page no. 982
*
*
UPS" into the end of the disconnected UPS cable.
Senographe DS
JC-DIAG-A-001.fm

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Questions and answers

Dr.Robert Mahmut
March 26, 2025

G.E.Essential l have recently bought What is the full weight.of the mamo Full weight of the console and other İtem's also measurements of each item with the main machine please All this Shipping Company required

1 comments:
Mr. Anderson
March 26, 2025

The GE Senographe DS mammography machine is shipped in three crates with the following dimensions and weights:

- Crate 1 (Gantry, Generator Cabinet, and ramp):
- Dimensions: 2066 mm (81.34 in) depth × 848 mm (33.39 in) width × 2292 mm (90.24 in) height
- Mass: 641 kg (1410.2 lbs)

- Crate 2 (Control Station):
- Dimensions: 1110 mm (43.70 in) depth × 770 mm (30.31 in) width × 1850 mm (72.83 in) height
- Mass: 210.5 kg (464.07 lbs) for truck transport (without side covers and lid)
- Mass: 223.5 kg (492.73 lbs) for plane/boat transport (with side covers and lid)

- Crate 3 (Detector):
- Dimensions: 872 mm (34.33 in) depth × 2270 mm (89.37 in) width × 260 mm (10.24 in) height
- Mass: 104.4 kg (229.68 lbs)

### Total Mass:
- For truck transport: 641 + 210.5 + 104.4 = 955.9 kg (2104.95 lbs)
- For plane/boat transport: 641 + 223.5 + 104.4 = 968.9 kg (2133.61 lbs)

These values include the gantry, generator cabinet, control station, detector, and all related components.

This answer is automatically generated

Subscribe to Our Youtube Channel

Table of Contents

Save PDF