GE Senographe DS Manual page 1402

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card D/R A311 - AWS Unit
tion Covers on page
6-2
Disassembly/Reassembly of AWS Unit on V1/V2 Control Stations
6-2-1
Disassembly of AWS Unit
1. Locate the AWS unit (1) inside the Control Station.
V1 Control Station
2. Remove all the connected cables from the AWS unit rear panel.
Note:
Note locations of all disconnected cables.
3. Remove the ground cable (screwdriver).
4. Release the AWS unit as follows:
On V1 Control Stations, remove the three nuts securing the upper right corner plate (2) (10 mm
open-ended wrench).
On V2 Control Stations, loosen the allen screws which secure the front and back brackets (2)
(6 mm allen wrench). For the front bracket, move the modem power supply to access the allen
screw.
5. Undo the Velcro strips (3) securing the AWS unit to the Control Station.
Chapter 9
Service Information and Procedures Class A 2385072-16-8EN
503.
2
1
3
Page no. 1402
Senographe DS
V2 Control Station
JC-DR-A-311.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents