Revision 1
8. Put the defective Anode Starter board in an anti-static bag.
6-2
Installation of the Anode Starter Board 300-PL2
1. Carefully place the new Anode Starter board on the Generator chassis. Ensure that the holes for the
four bolts line up with the four threads on the Generator chassis.
2. Attach the four bolts (1) (7 mm allen wrench) to secure the Anode Starter board to the Generator
chassis.
3. Connect all the cables to the new Anode Starter board as summarized in the diagram above and
table below.
Connector
Label
XJ1
XJ2
XJ3
4. Switch on the electrical power supply, both from the Mains Distribution Panel in the room and on the
JC-DR-A-412.fm
Service Information and Procedures Class A 2385072-16-8EN
XJ1
XJ3
Description of cable
(usually identified by code on a white label)
300 PL2 XJ1 2110264
(red line of the ribbon cable on the left-hand side as you
look directly at the board)
300 PL2 XJ3
Page no. 1611
Job Card D/R A412 - Anode Starter Board 300-PL2
XJ2
Empty
Senographe DS
1
Cable
color
Gray
N/A
Black
Chapter 9