GE Senographe DS Manual page 1527

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
7. The battery plug to the UPS is not connected at delivery time. Firmly connect the battery plug (7) to
the battery on the newly installed UPS as shown below.
UPS battery disconnected at delivery time
8
COMPLETION
Power up the Senographe system, and perform a UPS functional check according to
Check on page
1737, which is described in
Before sending the old UPS for recycling, ensure that the plug on the UPS has been disconnected from
the battery as shown below).
Old UPS from V1/V2 Control Stations
JC-DR-A-331.fm
Service Information and Procedures Class A 2385072-16-8EN
Connect UPS battery as shown below
7
Job Card CHK A003 - UPS
Plug
Disconnected
Old UPS from V3/V4 Control Stations
Page no. 1527
Senographe DS
Job Card D/R A331 - UPS
UPS Function
Batteries.
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents