GE Senographe DS Manual page 1128

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card D/R A189 - Interface Board
Connector
Label
J1
J2
J3
J4
J5
J6
J7
J8
J9
J10
J11
Eth
3. Ensure that jumper TP1 (3) that is to the left of the J4 connector on the Interface board is open.
3
4. Re-install the Gantry CPU board on the Interface board according to
Board on page 1133
5. Lift the top metal panel up to release it from the left side of the framework and replace it over the
framework to hide the newly installed Gantry CPU board.
6. Switch on the Gantry electrical power.
7. Wait until the Gantry boot is complete, and check that no error has been reported.
If the Interface board is operating correctly, the LED states are as follows:
all three of the green LEDs in the upper part of the Interface CPU board near the fiber connectors
J8, J9 and J10 (i.e. DS1, DS2, and DS3) are ON
the green LEDs DS8 and DS11 near the J5 connector are blinking (i.e. there is network activity on
the Ethernet connection)
all the other green LEDs near the J5 connector (i.e. DS4, DS5, DS6, DS7, DS9, DS10, DS12, and
DS13) are OFF
8. Reinstall the column cover (CPU side); refer to
ers on page
523.
Chapter 9
Service Information and Procedures Class A 2385072-16-8EN
Description of cable
(usually identified by code on a yellow label)
J1/PL104-W116
J2/PL104-W101
J3/PL104-W208
J4/PL104-W402
J5/PL104-W314
J6/PL104-W216
J7/PL104-W217
W121 - PL104 - J8
(to top fiber connector)
W120 - PL104 - J9
(to middle fiber connector)
W119 - PL104 - J10
(to bottom fiber connector)
(RJ-45 connector at bottom)
in
Job Card D/R A190 - Gantry CPU
Empty
Switch-AWS
Board.
Job Card PHY A044 - Remove/Reinstall Gantry Cov-
Page no. 1128
Senographe DS
Cable color
Gray
Gray
Gray
Black
Gray
Black
Black
Black
Black
Black
N/A
Gray
Replacing the Gantry CPU
JC-DR-A-189.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents