Job Card ELE A060 - Image Receptor Installation

1
SUPPLIES
Image receptor
(Digital Detector
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 2 Field Engineers
Time: 30 minutes
4
SAFETY PRECAUTIONS
WARNING
- Power off the Gantry before disconnecting or working on the Digital Detector.
- The Digital Detector is cumbersome. Two people are required for installation (see section
6-2, page
782). Follow standard safety practices for handling large components.
5
PRE-REQUISITES
The Gantry has been moved to its final position, and secured to the floor if necessary.
All procedures likely to require movement and disturbance in the area of the Tube and Image Recep-
tor have been completed.
Physical installation, inter-connection and AC connection of the Gantry, Generator Cabinet, and Con-
trol Station have been successfully completed.
5-1
Reception
The digital detector is delivered on a single pallet, along with the radiation screen, monitor and the
accessories. The Gantry and Generator Cabinet are delivered on another pallet. The Control Station is
delivered on another pallet. When a Senographe system arrives, check the entire consignment for dam-
age according to
Job Card PRE A001 - Checking for Damage on page
WARNING
Before installing the detector, you must leave it packed for at least one day so that it does
not suffer from condensation.
JC-ELE-A-060.fm
Service Information and Procedures Class A 2385072-16-8EN
+ Bucky)
Page no. 781
Job Card ELE A060 - Image Receptor Installation
371.
Senographe DS
Chapter 7
Chapter 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents