GE Senographe DS Manual page 1266

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card D/R A232 - Lift Screw Assembly
6-3
Preparation of the New Lift Screw
6-3-1
Clean Leadscrew
The Lift Screw Assembly is supplied with an anti-corrosion oil that is incompatible with the grease for the
Lead Screw, resulting in the degradation of the Lift Screw Assembly.
Clean the Leadscrew with a cleaner and a cloth until all of the old grease is fully removed, using the fol-
lowing sub-steps:
1. Apply Cleaner Spray to the Leadscrew. Recommended product: 3M Cleaner Spray (3M PN 50098)..
Note:
When working with grease, and to protect your hands against the Leadscrew, always wear rubber
cloves.
2. Use ORA Wipes (or equivalent) cloths for removing the grease from the Leadscrew. Rotate the ORA
Wipes cloth around the Leadscrew and draw wipe both direction along the entire length of the Lead-
screw as shown below.
Take care not to use the type of cloth wipes that could disintegrate, since the loosened threads or
particles may get mixed with the grease.
Chapter 9
Service Information and Procedures Class A 2385072-16-8EN
Page no. 1266
Senographe DS
Draw wipe in both
directions along the
entire length of the
Leadscrew
JC-DR-A-232.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents