GE Senographe DS Manual page 1589

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Connector
Tool
Label
XJ7
8 mm open ended
wrench
XJ9
8 mm open ended
wrench
F3-2
13 mm open
ended wrench
D27-AK
Cross-head
screwdriver
5. Except for the TP10 connector which you connected earlier, ensure that all the Test Point (TP) con-
nectors (labeled TP1, ... etc.) on the Generator Supply Command board are open.
6. Switch on the electrical power supply, both from the Mains Distribution Panel in the room and on the
rotary switch in the Generator cabinet (position I).
7. Switch on the Senographe system electrical power (i.e. Generator, Gantry, and Control Station).
8. Wait until the Gantry boot is complete, and check that no error has been reported.
If the Generator Command board is operating correctly, the LED states on the Generator Command
board are as follows:
green DE1 LED is ON
red DE2 LED is OFF
red DE3 LED is OFF
clear N1 LED is ON
9. Reinstall the Generator covers (see
page
513).
7
COMPLETION
None.
JC-DR-A-408.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A408 - Generator Supply Command Board 200-PL2
Description of cable
(usually identified by code on a white label)
XJ7 (on two cables)
200 PL2/XJ9
200 PL2/F3-2
200 PL2/D27-AK
Job Card PHY A042 - Remove/Reinstall Generator Covers on
Page no. 1589
Senographe DS
Cable color
Brown
Yellow/green
Black
Black
Black
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents