GE Senographe DS Manual page 1127

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
6-2
Replacing the Interface Board
1. Install the replacement Interface board and secure it using the four threaded nuts (1) and three
screws (2) (cross-head screwdriver).
1
2. Connect all the cables to the new Interface board as summarized in the diagram above and table
below. Ensure that the Ethernet cable is fully visible and does NOT go behind the PDU board.
Ensure that all the other cables are routed away from the Interface board, and that the stop button
cable which connects to J7 is routed around the Interface board and NOT behind the Interface board.
JC-DR-A-189.fm
Service Information and Procedures Class A 2385072-16-8EN
J1
J8
J9
J10
J5
Page no. 1127
Job Card D/R A189 - Interface Board
J6
J7
J4
2
J3
J2
J11
Eth
Senographe DS
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Table of Contents

Save PDF