GE Healthcare
Revision 1
Job Card DIAG A1000 - Gantry Diagnostic
Recommended Actions
1. Ensure that the Generator is powered on.
2. If the problem persists, use a multimeter to check the voltage between the TP10 connector and the
top left bolt earth point on Generator Supply Command board. The expected voltage when the W125
cable connections are firmly in place is 9.2 V ± 0.5 Vdc.
Earth
TP10
•
If the voltage between the TP10 connector and the earth point on the Generator Supply Com-
mand board is 9.2 V ± 0.5 V dc, change the PDU board according to
Board on page
•
If the voltage between the TP10 connector and the earth point on the Generator Supply Com-
mand board is 12 V ± 1 V dc, there is an issue with the connection W125 cable between the Gen-
erator Supply Command board and the PDU board. In this case, do the following:
Physically check for broken connections on the J2 connector on the PDU board and on the TP10
connector on Generator Supply Command board. If there are bad connections, ensure the cables
are well connected. If there are broken connections, change the appropriate board according to
Job Card D/R A408 - Generator Supply Command Board 200-PL2 on page 1583
A191 - PDU Board on page
•
If the voltage between the TP10 connector and the earth point on the Generator Supply Com-
mand board is less than 9.2 V ± 0.5 V dc, either the Generator Supply Command board is faulty
or the Main Distribution board is faulty. In this case, check the voltage between test point PVV
and 0VV on the Generator Supply Command board to determine which board to change.
If the PVV to 0VV measured voltage is 12 V ± 1 V dc, change the Generator Supply Command
board according to
1583.
If the PVV to 0VV measured voltage is not 12 V ± 1 V dc, change the Mains Distribution board
according to
Job Card D/R A411 - Mains Distribution Board 200-PL1 on page
Chapter 9
PVV
0VV
1137.
1137.
Job Card D/R A408 - Generator Supply Command Board 200-PL2 on page
Service Information and Procedures Class A 2385072-16-8EN
Page no. 972
Senographe DS
Job Card D/R A191 - PDU
or
Job Card D/R
1601.
JC-DIAG-A-1000.fm
Need help?
Do you have a question about the Senographe DS and is the answer not in the manual?
Questions and answers
G.E.Essential l have recently bought What is the full weight.of the mamo Full weight of the console and other İtem's also measurements of each item with the main machine please All this Shipping Company required
The GE Senographe DS mammography machine is shipped in three crates with the following dimensions and weights:
- Crate 1 (Gantry, Generator Cabinet, and ramp):
- Dimensions: 2066 mm (81.34 in) depth × 848 mm (33.39 in) width × 2292 mm (90.24 in) height
- Mass: 641 kg (1410.2 lbs)
- Crate 2 (Control Station):
- Dimensions: 1110 mm (43.70 in) depth × 770 mm (30.31 in) width × 1850 mm (72.83 in) height
- Mass: 210.5 kg (464.07 lbs) for truck transport (without side covers and lid)
- Mass: 223.5 kg (492.73 lbs) for plane/boat transport (with side covers and lid)
- Crate 3 (Detector):
- Dimensions: 872 mm (34.33 in) depth × 2270 mm (89.37 in) width × 260 mm (10.24 in) height
- Mass: 104.4 kg (229.68 lbs)
### Total Mass:
- For truck transport: 641 + 210.5 + 104.4 = 955.9 kg (2104.95 lbs)
- For plane/boat transport: 641 + 223.5 + 104.4 = 968.9 kg (2133.61 lbs)
These values include the gantry, generator cabinet, control station, detector, and all related components.