GE Senographe DS Manual page 1425

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
8. Ensure that the monitor cables have sufficient slack (5) within the Control Station so that they can
move. This ensures that the movement of the monitor cables are not inhibited when the rotative arm
is turned. Secure the harness to the monitor cables and mouse cable with a cable tie at 1 cm from
the end of the harness (6). Secure the monitor cables and mouse cable to the Control Station frame-
work with a cable tie (7).
9. Turn the rotative arm though all extremes, and check that the monitor harness, monitor cables, and
mouse cable are free to move as indicated below.
JC-DR-A-312.fm
Service Information and Procedures Class A 2385072-16-8EN
6
7
Page no. 1425
Job Card D/R A312 - Mouse
5
Senographe DS
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents