6-2
Reassembly of the Lift Board
1. Put the new Lift Board in place being careful not to pinch any of the existing cables in the area.
2. Use the six screws (1) to secure the new Lift Board (cross-head screwdriver) to the side of the Gan-
try.
3. Carefully reconnect all of the cables to the new Lift Board as summarized in the diagram above and
table below.
JC-DR-A-201.fm
Service Information and Procedures Class A 2385072-16-8EN
J6
J12
J1
J10
Page no. 1163
Job Card D/R A201 - Lift Board