GE Healthcare
Revision 1
2-12 E08: 071/082 Error on the Console Display
Start Power-up Sequence
See
Power-Up Sequence on page 1071
400PL1: voltage
between TP85 and
GNDB at 0 V?
Continuity OK in cable
between 400PL1 XJ10
No
and 400PL2 XJ2?
Change 400PL2.
(DR407 -
Change cable between 400PL1
XJ10 and 400PL2 XJ2.
JC-TSG-A-020.fm
No
400PL2: voltage
between TP25 and
No
TP4 at 5 V?
Yes
Change 400PL2.
(DR407 -
page 1577
No
Yes
Yes
Continuity between 400PL1
connector XJ1 pin 25 and
page 1577
No
200PL2 connector XJ1 pin
Change cable between 400PL1
XJ1 and 200PL2 XJ1.
Change cable between 200PL1
XJ11 and 200PL2 XJ2.
Change cable between 200PL1
XJ10 and main power contact K1.
Change main power contact K1.
Service Information and Procedures Class A 2385072-16-8EN
Job Card TSG A020 - Generator Power-Up Sequence Flow Charts
Are the following conditions present:
•
button on console lit
• Exposure disabled lamp on console lit
• Error message "E08 Power supply failure
071/082" on console display
No
Check and correct position of "SEL" wire on
200PL1. See
Connection on page
voltage greater than the true mains voltage.
200PL2: voltage
between TP4 and
No
0VV at 12 V?
Yes
25 OK?
Yes
Change 400PL1.
(DR406 -
page
1569)
Page no. 1081
Yes
200PL1 DS5 and
DS6 both lit?
Yes
200PL1: voltage
between PT20 and
0VE less than 2 V?
No
Yes
Job Card PHY A016 - AC
469. "SEL" wire is set to a
Main power contact
K1 terminal K1–14 at
12 V?
No
Continuity between 200PL1
connector XJ11 pin 15 and
No
200PL2 connector XJ2 pin
15 OK?
Yes
Cable between 200PL1
XJ10 and main power
No
contact K1 OK?
Yes
Main power contact K1
between K1–13 and
No
K1–14 OK?
Yes
Change 200PL1.
Senographe DS
Change 200PL2.
Yes
Change 200PL2.
Chapter 9
Need help?
Do you have a question about the Senographe DS and is the answer not in the manual?