GE Senographe DS Manual page 1501

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
16. Turn the rotative arm though all extremes, and check that the harness, monitor cables, and mouse
cable are free to move as indicated below.
17. When moving the rotative arm through the extreme positions, check that the stop bracket screw (18)
is correctly positioned to avoid a collision with the radiation screen.
18. Reinstall the Omega cover then Top cover (refer to
Station Covers on page
19. Reinstall and reconnect X-ray Console.
JC-DR-A-319.fm
Service Information and Procedures Class A 2385072-16-8EN
503).
Page no. 1501
Job Card D/R A319 - Rotative Arm
18
Job Card PHY A040 - Remove/Reinstall Control
Senographe DS
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents