GE Senographe DS Manual page 1349

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
allen wrench).
3. Remove the faulty Bucky board by carefully sliding it upwards to the lefthand side away from the
Bucky, being careful not to damage the metal arm (5) connected to the Bucky.
4. Insert the new Bucky board from the left hand side, by carefully sliding it downwards to into the
Bucky. When inserting the Bucky board be careful to ensure that the metal arm (5) connected to the
Bucky passes in between the optical fork on the Bucky board.
5. Use the four allen screws and washers (4) secure the Bucky board to the Bucky (2.5 mm allen
wrench).
6. Carefully connect the Bucky connector cables (1 and 2) and Bucky motor cable (3) to the new Bucky
board.
Note:
The connectors on the Bucky connector cable and Bucky motor cable are fragile. Ensure you take
care not to break them when connecting them to the new Bucky board.
JC-DR-A-258.fm
Service Information and Procedures Class A 2385072-16-8EN
Page no. 1349
Senographe DS
Job card D/R A258 - Bucky Board
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents