GE Senographe DS Manual page 1612

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card D/R A412 - Anode Starter Board 300-PL2
rotary switch in the Generator cabinet (position I).
5. Switch on the Senographe system electrical power (i.e. Generator, Gantry, and Control Station).
Wait until the Gantry boot is complete, and check that no error has been reported.
6. Reinstall the Generator covers (see
page
513).
7
COMPLETION
None.
Chapter 9
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A042 - Remove/Reinstall Generator Covers on
Page no. 1612
Senographe DS
JC-DR-A-412.fm