GE Healthcare
Revision 1
Job Card D/R A255 - Bucky
1
SUPPLIES
Bucky
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 35 minutes
4
SAFETY PRECAUTIONS
Not applicable
5
PREREQUISITES
Before installing the new Bucky, make sure that the Bucky is placed for at least 30 minutes in a dry
room whose temperature is greater than or equal to 20
! Notice:
Never put the Bucky onto a hot surface to speed up this process.
6
PROCEDURE
6-1
Principle
Bad repositioning of the Bucky during gain calibration or during acquisitions result in vertical artifacts on
the image (perpendicular to the grid lines).
The correct Bucky position is ensured by the proper
tightening of the two latches, one each side of the
Bucky.
6-2
Installation of New Bucky
To ensure a correct positioning of the Bucky, the following procedure must be followed:
JC-DR-A-255.fm
Service Information and Procedures Class A 2385072-16-8EN
°
°
C (68
F).
Page no. 1339
Senographe DS
Job Card D/R A255 - Bucky
Chapter 9
Chapter 9