Job Card D/R A332 - Ups Battery Replacement - GE Senographe DS Manual

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1

Job Card D/R A332 - UPS Battery Replacement

1
SUPPLIES
UPS Battery
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 4.5 hours
4
SAFETY PRECAUTIONS
WARNING
Before starting, shut down the equipment correctly and switch off the Senographe system
hospital supply circuit breaker. Lock it in the off position or mark it clearly with a warning
sign to prevent others from applying power.
5
PREREQUISITES
Remove the Control Station Omega cover (see
Covers on page
503).
6
PROCEDURE ON V1/V2 CONTROL STATIONS
6-1
Disassembly of the UPS Battery on a V1/V2 Control Station
1. Remove the UPS from the Control Station (see
section 6-1,
Disassembly of the UPS on V1/V2 Control Stations on page
To disassemble the UPS battery, you must do the following:
1. Switch off the electrical power supply from the Mains Distribution Panel in the room. Wait 10 min-
utes for the Battery to discharge.
JC-DR-A-332.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A332 - UPS Battery Replacement
Job Card PHY A040 - Remove/Reinstall Control Station
Job Card D/R A331 - UPS on page
Page no. 1529
Senographe DS
Chapter 9
1521,
1521).
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents