GE Senographe DS Manual page 1597

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
6-2
Installation of the Inverter Board 300-PL1
1. Carefully place the new Inverter board on the Generator chassis. Ensure that the one thread passes
thorough the Inverter board top middle hole, and ensure that the holes for the six bolts line up with
the four threads on the Generator chassis.
2. When placing the new Inverter board on the Generator chassis ensure that you the thread the three
sets of brown cables through the holes in the Inverter board (1, 2, 3).
3. Attach the bolt (4) (7 mm open ended wrench) to the thread.
4. Attach the six bolts (5) (7 mm allen wrench) to secure the rest of the Inverter board to the Generator
chassis.
5. Connect all the cables to the new Inverter board as summarized in the diagram and table below.
Connec-
tor Label
XJ1
X1
10 mm open ended wrench
X2
X3
10 mm open ended wrench
X4
10 mm open ended wrench
X5
10 mm open ended wrench
X6
10 mm open ended wrench
X7
10 mm open ended wrench
X8
10 mm open ended wrench
X9
10 mm open ended wrench
JC-DR-A-410.fm
Service Information and Procedures Class A 2385072-16-8EN
2
3
Tool
N/A
N/A
Two cables, one from below and one from behind: X8
Job Card D/R A410 - Inverter Board 300-PL1
1
Description of cable
(usually identified by code on a white label)
300 PL1 XJ1 2110262
(red line at top of ribbon connector)
X1
Empty
X3
X4
X5
X6
X7
X9
Page no. 1597
Senographe DS
4
5
Cable
color
Gray
Black
N/A
Brown
Brown
Black
Brown
Brown
Brown
Brown
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Table of Contents

Save PDF