Reassembly of the New UPS Battery on a V3/V4 Control Station
1. Affix a paper label with the charging date on new battery.
2. Connect the battery leads to the new battery.
Note:
Small sparks at the battery connectors are normal during connection.
Connect the red wire to the positive (+) terminal and the black wire to the negative (–)terminal.
3. Slide the battery into the UPS.
4. Close the battery door, replace the battery compartment screws, and replace thefront cover.
5. Dispose of the old battery according to local requirements at an appropriate recycling facility or
return it to the supplier in the packing material for the new battery.
6. Re-plug the battery connector by pushing the tethered jumper plug into the corresponding port.
7-3
New Battery Charging
1. Connect the UPS directly to a compatible power supply voltage.
2. Press the button
3. Wait four hours for the new Battery to charge.
Note:
The battery charges to 90% capacity during the first four hours of normal operation. Do not expect
full battery run capability during this initial charge period.
2. Put the UPS unit back into the control station (see
bly of the New UPS Battery on a V3/V4 Control Station on page
8
COMPLETION
Power up the Senographe system, and perform a UPS functional check according to
Check on page 1737
teries..
Use the front display panel picture and the chart below for more information about LED
display and indicators
JC-DR-A-332.fm
on the front panel to power the UPS.
and a Battery Capacity Recalibration described in
Service Information and Procedures Class A 2385072-16-8EN
Job Card D/R A332 - UPS Battery Replacement
Job Card D/R A331 - UPS
Page no. 1535
Senographe DS
section
1535).
UPS Function
Job Card CHK A003 - UPS Bat-
7-2 Reassem-
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents