GE Senographe DS Manual page 1098

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card D/R A121 - Optical Fiber (Gantry to Generator)
10. Replace this fiber, respecting connector color coding.
11. Temporarily reconnect the four fibers to the generator and Gantry, and check that the system oper-
ates correctly when the electrical power is switched on.
12. Disconnect the four fibers and reinstall the ribbed outer cover in the harness.
13. Carefully install new cable ties, particularly inside the Gantry and between the base plate and Gantry
interface board PL104.
6-2
Functional Check
1. Switch on the Senographe electrical power.
2. Raise and lower the column and visually check that the movement is not fouling any of the cables.
3. Reinstall the generator covers and the Gantry column covers.
7
COMPLETION
None
Chapter 9
Service Information and Procedures Class A 2385072-16-8EN
Page no. 1098
Senographe DS
JC-DR-A-121.fm

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Table of Contents

Save PDF