GE Senographe DS Manual page 1263

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
10. Release the screws (11) of Upper L-Shape Bearing Housing (12) (5 mm allen wrench) and remove it.
11. Power off the Gantry.
12. If you are changing a Type 2 Lift Screw Assembly, disconnect the earth cable that is routed to the
bottom left corner of the Detector Power Supply plate. If theType 2 Lift Screw Assembly also has the
Top Brake installed, remove the Top Brake cable from the J6 connector on the Lift Board.
If you are changing a Type 3 Lift Screw Assembly, disconnect the earth cable that is routed to the
bottom left corner of the Detector Power Supply plate and disconnect the Motor Brake cable that is
connected to the J6 connector on the Lift Board.
13. Remove the Lift Board (refer to
screws that connect the lower part (Bearing Block) of the Lift Screw Assembly to the Gantry frame.
14. When you remove the Lift Board, route the cables (13) from the DC motor though the side of the
JC-DR-A-232.fm
Service Information and Procedures Class A 2385072-16-8EN
11
Job Card D/R A201 - Lift Board on page
Page no. 1263
Job Card D/R A232 - Lift Screw Assembly
12
1161). This exposes the
Senographe DS
Chapter 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents