ABB IRB 5720 Product Manual page 381

Table of Contents

Advertisement

8
9
10
11
Product manual - IRB 5720
3HAC079195-001 Revision: A
Action
Remove the guide pins and replace with
the remaining attachment screws.
Tighten the screws.
Disconnect the brake release tool.
Perform a leak-down test.
© Copyright 2022 ABB. All rights reserved.
5.8.4 Replacing the axis-4 motor
Note
Hex socket head cap screw: M10x30 12.9
Gleitmo 603+Geomet 500 (2 pcs)
xx2100002213
Tightening torque: 24 Nm.
See
Performing a leak-down test on
page
188.
Continues on next page
5 Repair
Continued
381

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents