ABB IRB 5720 Product Manual page 531

Table of Contents

Advertisement

4
5
6
Preparations before refitting the upper arm
1
2
Product manual - IRB 5720
3HAC079195-001 Revision: A
Action
Slide the gearbox into position and fit the
attachment screws and washers.
Remove the guide pins and fit the remain-
ing attachment screws and washers.
Tighten the attachment screws.
Action
Wipe clean all contact surfaces.
Fit two guide pins in opposite M12 holes
in the axis-3 gearbox.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
© Copyright 2022 ABB. All rights reserved.
5.9.3 Replacing the axis-3 gearbox
Note
Hex socket head cap screw : M10x40 12.9
Gleitmo 603+Geomet 500 (27 pcs ).
xx2100002449
xx2100002446
Tightening torque: see standard torque in
Screw joints on page
592.
Note
Guide pin, M12x150: 3HAC13056-2
Always use guide pins in pairs.
xx2100002445
Continues on next page
5 Repair
Continued
531

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents