ABB IRB 5720 Product Manual page 199

Table of Contents

Advertisement

Required service parts
Consumable
Grease
Rust preventive
Sealant (grey)
O-ring, nitrile rubber
Locking liquid
Required tools and equipment
Equipment
Replacement tool for cassette
sealing
Standard toolkit
Removing the cassette sealing
Use these procedures to remove the cassette sealing.
Preparations before removing the cassette sealing
1
2
Product manual - IRB 5720
3HAC079195-001 Revision: A
Action
Jog the robot to synchronization position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
© Copyright 2022 ABB. All rights reserved.
5.4.1 Replacing the axis-1 cassette sealing
Article number
Note
3HAC042536-001
Shell Gadus S2
3HAC034903-001
Mercasol 3110 Waxcoat. Recom-
mended drying time is 24h.
3HAC026759-001
Sikaflex 521FC.
Protection type Foundry Plus.
Not required for option Inverted
(3317-1).
3HAB3772-57
164.69x3.53
On axis-1 sealing ring.
Not required for option Inverted
(3317-1).
3HAC041807-004
Loctite 2400
Article number
Note
3HAC079880-001
For removing and fitting cassette
sealing on axis 1
-
Content is defined in section
Standard toolkit on page
Note
5 Repair
Continued
596.
Continues on next page
199

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents