ABB IRB 5720 Product Manual page 371

Table of Contents

Advertisement

Required tools and equipment
Equipment
Brake release tool
Guide pin, M10x150
Bits extender
Removal tool motor M12
Rotation tool
Calibration toolbox, Axis Calibra-
tion
Standard toolkit
Removing the motor
Use these procedures to remove the motor.
Preparations before removing the motor
1
Product manual - IRB 5720
3HAC079195-001 Revision: A
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
© Copyright 2022 ABB. All rights reserved.
5.8.4 Replacing the axis-4 motor
Article number
Note
3HAC081310-001
User instructions are enclosed
with the tool.
3HAC15521-2
Always use guide pins in pairs.
3HAC12342-1
300 mm, bits 1/2"
3HAC14631-1
Used to push out the motor, if
necessary.
Always use removal tools in
pairs.
3HAB7887-1
Used to rotate the motor pinion.
3HAC074564-001
Delivered as a set of calibration
(axes 1, 2, 3 and 4)
tools.
3HAC074119-001
Required if Axis Calibration is the
(axes 5 and 6)
valid calibration method for the
robot.
-
Content is defined in section
Standard toolkit on page
Note
5 Repair
Continued
596.
Continues on next page
371

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents