GE Senographe DS Manual page 429

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Ground cable
29. Distribute evenly (36) the harness over the monitor cables on both sides of the monitor support.
30. Place the mouse at the back of the mouse support (so that there is enough cable for use of the
mouse on the entire mouse support).
31. Use pointed nose pliers to create an opening in the harness at 27 cm from the end of the harness.
JC-PHY-A-009.fm
Service Information and Procedures Class A 2385072-16-8EN
35
Job Card PHY A009 - Opposite Side Rotative Arm Installation
36
Page no. 429
Senographe DS
36
27 cm
Chapter 6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Table of Contents

Save PDF