GE Senographe DS Manual page 509

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
back of the Control Station.
6. If the radiation screen is present, re-install the edge pinch that you previously removed in steps 3 and
4 and secure it with two screws (6).
7. If the radiation screen is present, carefully introduce the pinch plate (7) between the edge pinch and
the radiation screen.
7
8
8. If the radiation screen is present, tighten with moderation the two screws (8).
JC-PHY-A-040.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A040 - Remove/Reinstall Control Station Covers
Page no. 509
5
6
Senographe DS
Chapter 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents