GE Senographe DS Manual page 544

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1
Job Card ELE A006 - First System Power-On
4. A series of system initialization messages appears on the screen, then the Login: prompt appears.
Login as the sdc user as follows:
a. At the Login: prompt enter:
sdc
b. At the Password: prompt, press the <Return> key.
The Browser window appears after a short delay with the AWS login screen.
Note:
As the Detector is not yet connected, some error messages related to acquisition capability appear
on the screen.
If the screen is still blank after about 30 seconds, check that the monitor is switched on (the green
LED must be lit) and connected. Check that the keyboard is also connected.
5. At the AWS login screen, select clinical from the Username drop-down field, type clinical in the
Password field and click the OK button.
The Browser appears.
6. Check that the ADS Computer can communicate with the IDC, as follows:
a. Check that the IDC is powered up (power LED on the front of the IDC is lit on and the fans are
working). If the IDC is not powered up ensure that the power switch on the front of the IDC is set
to on (I).
b. From behind the Browser, launch a command window (see
on page
120).
A command window appears with an ADS prompt.
c. Attempt to ping the IDC, by entering:
ping idc
If the IDC responds to the ping command then communications are fine.
If the IDC does not respond to the ping command then check all IDC cable connections, Espe-
cially ADS-IDC Ethernet communication. Check that both ADS and IDC Ethernet cables are cor-
rectly plugged into the switch.
When the system has been successfully powered up, it must be powered down ready for the next steps
in the installation process.
Follow the normal shutdown procedure described on the following page.
Chapter 7
Service Information and Procedures Class A 2385072-16-8EN
Power switch must be set to I
Power LED
Page no. 544
Launching a Command Line Window
Senographe DS
JC-ELE-A-006.fm

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Questions and answers

Dr.Robert Mahmut
March 26, 2025

G.E.Essential l have recently bought What is the full weight.of the mamo Full weight of the console and other İtem's also measurements of each item with the main machine please All this Shipping Company required

1 comments:
Mr. Anderson
March 26, 2025

The GE Senographe DS mammography machine is shipped in three crates with the following dimensions and weights:

- Crate 1 (Gantry, Generator Cabinet, and ramp):
- Dimensions: 2066 mm (81.34 in) depth × 848 mm (33.39 in) width × 2292 mm (90.24 in) height
- Mass: 641 kg (1410.2 lbs)

- Crate 2 (Control Station):
- Dimensions: 1110 mm (43.70 in) depth × 770 mm (30.31 in) width × 1850 mm (72.83 in) height
- Mass: 210.5 kg (464.07 lbs) for truck transport (without side covers and lid)
- Mass: 223.5 kg (492.73 lbs) for plane/boat transport (with side covers and lid)

- Crate 3 (Detector):
- Dimensions: 872 mm (34.33 in) depth × 2270 mm (89.37 in) width × 260 mm (10.24 in) height
- Mass: 104.4 kg (229.68 lbs)

### Total Mass:
- For truck transport: 641 + 210.5 + 104.4 = 955.9 kg (2104.95 lbs)
- For plane/boat transport: 641 + 223.5 + 104.4 = 968.9 kg (2133.61 lbs)

These values include the gantry, generator cabinet, control station, detector, and all related components.

This answer is automatically generated

Table of Contents

Save PDF