Job Card Phy A040 - Remove/Reinstall Control Station Covers - GE Senographe DS Manual

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1

Job Card PHY A040 - Remove/Reinstall Control Station Covers

1
SUPPLIES
None
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 10 minutes to remove and 10 minutes to reinstall
4
SAFETY PRECAUTIONS
WARNING
Before beginning work, shut down the equipment and switch off the Generator hospital
supply circuit breaker. Lock it in the off position or mark it clearly with a warning sign to
prevent others from applying power.
Never switch off at the UPS except in emergency (risk of data loss).
5
PREREQUISITES
Unplug and remove the X-ray Console.
6
REMOVAL & REINSTALLATION OF V2/V3/V4 CONTROL STATION
COVERS
6-1
Top Cover Disassembly
To remove the top cover on V2/V3/V4 Control Stations:
1. Remove the three screws (1) securing the bar (4 mm allen wrench) on the blue top cover and remove
the bar.
JC-PHY-A-040.fm
Service Information and Procedures Class A 2385072-16-8EN
1
Job Card PHY A040 - Remove/Reinstall Control Station Covers
Page no. 503
Senographe DS
Chapter 6
Chapter 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents