Pre-Installation System Requirements
9.

PLANNING FOR STORAGE

9-1. Temporary Storage in the Hospital
! Notice:
There is normally a short delay (e.g., overnight) between the delivery of the equipment and its in-
stallation.
If this delay is not short (more than two days), it is essential that a suitable storage room is
available to receive the equipment in its crates.
Refer to section
9-2. Packing Information
The table below lists the main dimensions and masses of shipping crates.
TABLE 6 - SHIPPING DIMENSIONS AND MASSES.
Item
Crate1
Crate 1 includes the Gantry and the Generator Cabinet and the ramp for removing the Gantry, Generator and
Control Station
Crate 2
Crate 2 includes the Control Station
Crate 3
Crate 3 includes the box containing the Detector. (20 kg, D=766 (30.16) , W= 840 (33.07), H =654 (25.39) and
the Radiation Screen in its protective packaging
Crate 4
Crate 4 includes the Accessories Cabinet, which includes the LCD Monitor, X-ray Console and all the Accesso-
ries (boxed) . * - The contents can vary, and the mass can be slightly different to 147 kg.
Chapter 4
Service Information and Procedures Class A 2385072-16-8EN
1 Environmental Requirements
Dimensions in mm (inches)
Depth
2066 (81.34)
1110 (43.70)
872 (34.33)
720 (28.35)
for information on the environment required.
Width
848 (33.39)
770 (30.31)
2270 (89.37)
1300 (51.18)
Page no. 340
Senographe DS
Height
2292 (90.24)
641 (1410.2)
1850 (72.83)
210.5 (464.07) for
truck transportation
without side covers
223.5 (492.73) for
plane/boat trans-
portation with side
covers and lid
260 (10.24)
104.4 (229.68)
1975 (77.76)
147 (323.4) *
Mass in
kg (lbs)
and lid
Chap-Pre-Requirements.fm