Job Card Phy A030 - Generator And Gantry Disconnection Reconnection - GE Senographe DS Manual

Hide thumbs Also See for Senographe DS:
Table of Contents

Advertisement

GE Healthcare
Revision 1

Job Card PHY A030 - Generator and Gantry Disconnection Reconnection

1
SUPPLIES
Cable ties (during the reconnection phase)
2
TOOLS
Standard Tool Box
3
APPLICABILITY
Use this Job Card when you cannot transport the Generator and Gantry together due the physical con-
straints of the corridors/elevators on a hospital site.
4
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 60 minutes (20 minutes to disconnect and 40 minutes to reconnect)
5
SAFETY PRECAUTIONS
None
6
PREREQUISITES
Read the sub-sections to understand the nature of the connections that you are about to remove.
6-1
Summary of Connections
The following table summarizes all of the connections on the Generator that you need to disconnect and
then reconnect once the equipment is in the desired hospital room.
The thick line indicates the separation between the upper part of the Generator and lower part of the
Generator.
You can use the D and R columns in this table to mark-off when you have disconnected and recon-
nected the appropriate cable.
Note:
The not applicable (N/A) entry for the HV Cable means that the HV Cable is not connected when
it arrives. However, you have to cut any associated cable ties that secure the HV Cable.
The C column indicates which conduit (1 or 2) the cable originates from.
JC-PHY-A-030.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A030 - Generator and Gantry Disconnection Reconnection
Page no. 479
Senographe DS
Chapter 6
Chapter 6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Senographe DS and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF