5 Repair
5.8.4 Replacing the axis-4 gearbox
Continued
3
4
5
Loosening the cable package from axis-4 gearbox
1
2
Continues on next page
540
Action
Remove the screws and washers.
Carefully lift out the motor.
Remove the timing belt from its groove on the
motor.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Valid for IRB 1100-4/0.475
Access the cable package locking screw on the
axis-4 gearbox from the wrist and then loosen the
locking screw.
© Copyright 20192020 ABB. All rights reserved.
Note
xx1800002996
xx1800002997
Note
xx1800003031
Product manual - IRB 1100
3HAC064992-001 Revision: C