ABB Robotics IRB 1100 Product Manual page 113

Table of Contents

Advertisement

Removing the upper cable package
Use these procedures to remove the upper cable package.
Preparations before removing the upper cable package
1
2
3
Removing the axis-2 motor
1
2
Product manual - IRB 1100
3HAC064992-001 Revision: C
Action
Decide which calibration routine to use, and take
actions accordingly prior to beginning the repair
procedure.
Jog the robot to the specified position:
Axis 1: 0°
Axis 2: 110° (IRB 1100-4/0.475) /95° (IRB
1100-4/0.58)
Axis 3: -20° (IRB 1100-4/0.475)/ -6° (IRB
1100-4/0.58)
Axis 4: 0°
Axis 5: 0°
Axis 6: No significance.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safeguarded
space.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the swing support cover.
© Copyright 20192020 ABB. All rights reserved.
5.3.1 Replacing the upper cable package
Note
xx1800003289
Note
xx1800002488
Continues on next page
5 Repair
Continued
113

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 1100-4/0.475Irb 1100-4/0.58

Table of Contents