5
Removing the axis-3 motor
1
2
3
Product manual - IRB 1100
3HAC064992-001 Revision: C
Action
Remove the cable bracket.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove the lower arm cover.
Loosen the screws and move the motor slightly
to slacken the timing belt.
© Copyright 20192020 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the lower arm
Continued
Note
xx1800003006
Note
xx1800003007
xx1800003008
Continues on next page
289