ABB IRB 6710 Product Manual page 531

Table of Contents

Advertisement

3
4
5
Product manual - IRB 6710
3HAC085695-001 Revision: A
Action
DressPack
If used, push the DressPack tube a little
backwards.
Tip
Use tape and tie the axis-5 and axis-6
connectors and carrier into a bundle (if not
already done). This is done to facilitate the
removal and to avoid damaging the parts.
This will also make it easier to run the cable
harness through the inside of the upper
arm.
Remove the side cover on the arm tube.
© Copyright 2023 ABB. All rights reserved.
5.8.3 Replacing the axis-3 gearbox
Note
xx1400000720
xx1300000668
xx2300000031
Continues on next page
5 Repair
Continued
531

Advertisement

Table of Contents
loading

Table of Contents