ABB IRB 6710 Product Manual page 413

Table of Contents

Advertisement

6
7
8
9
10
Connecting the axis-5 motor cables
1
Product manual - IRB 6710
3HAC085695-001 Revision: A
Action
Use caution and lower the motor into posi-
tion on the guide pins, while at the same
time rotating the motor pinion slightly.
Make sure that:
the motor pinion is properly mated
to the gear of the gearbox.
the motor pinion does not get dam-
aged.
the direction of the cable exit is fa-
cing the same way as before remov-
al.
Remove the guide pins.
Secure the motor with its attachment
screws and washers.
Perform a leak-down test.
Disconnect the brake release tool.
Action
Put the motor cables in place in the open-
ing.
© Copyright 2023 ABB. All rights reserved.
5.7.5 Replacing the axis-5 motor
Note
Rotation tool M4, 3HAB7887-1
xx2100002205
Hex socket head cap screw: M10x30 12.9
Gleitmo 603+Geomet 500 (4 pcs)
Tightening torque: 24 Nm.
xx2100002204
See
Performing a leak-down test on
page
178.
Note
Continues on next page
5 Repair
Continued
413

Advertisement

Table of Contents
loading

Table of Contents