ABB IRB 6710 Product Manual page 461

Table of Contents

Advertisement

10
11
12
Product manual - IRB 6710
3HAC085695-001 Revision: A
Action
Visually verify through the axis-1 motor
hole that the hole is aligned with the pinion
hole in the gearbox.
Lower the arm system slowly until the
heads of the gearbox attachment screws
are starting to disappear inside the frame
edge.
Verify visually from the side and from the
front/back that the frame is coming down
completely level against the gearbox. If the
frame is somewhat tilted, adjust the lifting
position with the overhead crane.
Note
While lowering the complete arm system,
check that the cylindrical pin is fitted cor-
rectly.
Lower the complete arm system into posi-
tion on top of the gearbox.
© Copyright 2023 ABB. All rights reserved.
5.8.1 Replacing the axis-1 gearbox
Note
xx1700002040
xx2200001613
xx1700002042
xx1700002043
Continues on next page
5 Repair
Continued
461

Advertisement

Table of Contents
loading

Table of Contents