ABB IRB 6710 Product Manual page 287

Table of Contents

Advertisement

Spare part
Cable harness
Cable harness
Required tools and equipment
Equipment
Standard toolkit
Preparations before removing the cable harness
1
2
Product manual - IRB 6710
3HAC085695-001 Revision: A
Action
Floor-standing robot:
Jog the robot to the specified position:
Axis 1: 0°
Axis 2: -60°
Axis 3: +60°
Axis 4: 0°
Axis 5: +90°
Axis 6: No significance.
Note
The specified position is a recommended
position.
Orient axis-5 as close as possible to +90°
to be able to open the axis-6 motor cover
and to remove the axis-6 motor cables. The
axis-5 position is also important to avoid
the spiral of the cable harness in the carrier
being unwound or placed in wrong position.
Depending on what tool is used, the other
axes may need to be jogged to another
position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the safe-
guarded space.
© Copyright 2023 ABB. All rights reserved.
5.6.1 Removing the cable harness
Article number
Note
3HAC083039-001
IRB 6710-210/2.65
(CH31)
IRB 6710-175/2.65 LID
3HAC078462-001
IRB 6710-200/2.95
(CH31-L)
IRB 6710-175/2.95 LID
Article number
Note
-
Content is defined in section
Standard toolkit on page
Note
xx2200001615
5 Repair
Continued
Level
L2
L2
628.
Continues on next page
287