asieps_tobira_IM_US.book 77 ページ 2012年1月17日 火曜日 午後3時48分
18) Attach the 5th-6th shifting insert key at the ap-
propriate position of the 5th-6th sleeve.
NOTE:
The angle of each shifting insert key is 120°.
(A) 5th-6th sleeve
(B) Shifting insert key
19) Attach the 5th-6th sleeve to the 5th-6th hub.
NOTE:
• There are two identification grooves on the 5th-
6th sleeve.
• Place the grooves towards the 5th drive gear,
and attach the 5th-6th sleeve.
(B)
(A) 5th drive gear
(B) 5th-6th sleeve identification groove (2 grooves)
Main Shaft Assembly
(A)
(B)
MT-00673
(A)
MT-00572
6MT-77
MANUAL TRANSMISSION AND DIFFERENTIAL
20) Install the 6th baulk ring.
21) Apply adequate gear oil to the main shaft, 6th
needle bearing and 6th drive gear inner surface.
22) Install the 6th drive gear.
23) Install the 6th needle bearing.
24) Being careful not to cover the oil holes of the
6th bushing and the main shaft, set the 6th bushing
to the main shaft.
(A)
(A) 6th bushing oil hole
(B) Main shaft oil hole
MT-00573
MT-00574
MT-00575
(A)
(B)
MT-00576