Subaru IMPREZA GD 2007 Series Manual page 2978

Table of Contents

Advertisement

asieps_tobira_IM_US.book 73 ページ 2012年1月17日 火曜日 午後3時48分
2) Install the 3rd needle bearing and 3rd drive gear
to the main shaft.
(A)
(B)
(A) 3rd needle bearing
(B) 3rd drive gear
3) Install the inner baulk ring, 3rd synchro cone and
outer baulk ring.
(A)
(A) Inner baulk ring
(B) Outer baulk ring
NOTE:
Install the 3rd synchro cone by aligning the protru-
sion of the 3rd synchro cone with the hole on the
3rd drive gear.
Main Shaft Assembly
MANUAL TRANSMISSION AND DIFFERENTIAL
4) Install the 3rd-4th hub and 4th bushing.
(1) Being careful of the install direction of the
3rd-4th hub, set to the main shaft.
MT-00560
(A) Main shaft
(B) 3rd-4th hub
(C) 3rd drive gear
(2) Being careful not to cover the oil holes of the
main shaft and 4th bushing, attach to the main
shaft.
(B)
(B)
MT-00561
(A) 4th bushing
(B) 3rd-4th hub
MT-01501
(C) 4th bushing oil hole
(D) Main shaft oil hole
6MT-73
(A)
(B)
(C)
MT-00884
(A)
A
(C)
A
(D)
(C)
(A)
(D)
(C)
A - A
MT-00885

Advertisement

Table of Contents
loading

This manual is also suitable for:

Impreza gg 2007 series

Table of Contents