asieps_tobira_IM_US.book 63 ページ 2012年1月17日 火曜日 午後3時48分
5) Install the 2nd driven gear, inner baulk ring, syn-
chro cone and outer baulk ring, and insert them
onto driven shaft.
(A) 2nd driven gear
(B) Inner baulk ring
(C) Synchro cone
(D) Outer baulk ring
6) After installing key on driven shaft, install the
3rd-4th driven gear using an ST and a press.
CAUTION:
Do not apply a load in excess of 10 kN (1 ton, 1.1
US ton, 1.0 Imp ton).
NOTE:
Align the groove in baulk ring with the insert.
ST 499277200
INSTALLER
7) Install a set of roller bearings onto the driven
shaft using the ST and a press.
CAUTION:
Do not apply a load in excess of 10 kN (1 ton, 1.1
US ton, 1.0 Imp ton).
ST 499277200
INSTALLER
Drive Pinion Shaft Assembly
(D)
(A)
(B)
(C)
MT-01329
ST
MT-00255
ST
MT-00256
5MT-63
MANUAL TRANSMISSION AND DIFFERENTIAL
8) Position the woodruff key in groove of the rear of
driven shaft. Install the 5th driven gear onto driven
shaft using ST and a press.
CAUTION:
Do not apply a load in excess of 10 kN (1 ton, 1.1
US ton, 1.0 Imp ton).
ST 499277200
INSTALLER
9) Install the lock washer. Install the lock nut and
tighten to the specified torque using the ST.
ST 499987300
SOCKET WRENCH (50)
Tightening torque:
260 N·m (26.5 kgf-m, 191.7 ft-lb)
NOTE:
• Crimp the locknut in 2 locations.
• Using a spring scale, check that starting torque
of roller bearing is 0.1 to 1.5 N (0.01 to 0.15 kgf,
0.02 to 0.33 lbf).
ST
MT-00257
ST
MT-00258
MT-00259