Subaru IMPREZA GD 2007 Series Manual page 2810

Table of Contents

Advertisement

asieps_tobira_IM_US.book 37 ページ 2012年1月17日 火曜日 午後3時48分
8) Install the boot plate.
NOTE:
Install the inner boot taking care not to twist it.
Tightening torque:
7.5 N·m (0.76 kgf-m, 5.5 ft-lb)
9) Install the console box. <Ref. to EI-46, INSTAL-
LATION, Console Box.>
10) Make sure the gears can be shifted accurately
into each gear.
C: DISASSEMBLY
1. 5MT
1) Remove the lock wires.
(A) Lock wire
2) Remove the rod from lever.
(A)
(C)
(A) Rod
(B) Lever
(C) Stay
3) Separate the rod and inner boot.
MT Gear Shift Lever
4) Remove the snap ring from the stay.
(A) Snap ring
5) Separate the gear shift lever and the stay.
CS-00219
6) Remove the boot, bushing and snap ring from
gear shift lever.
(A)
(A)
CS-00316
(A) O-ring
(B) Bushing
(C) Snap ring
(B)
CS-00317
CS-37
CONTROL SYSTEMS
(A)
CS-00318
CS-00319
(B)
(A)
(C)
CS-00320

Advertisement

Table of Contents
loading

This manual is also suitable for:

Impreza gg 2007 series

Table of Contents