asieps_tobira_IM_US.book 40 ページ 2012年1月17日 火曜日 午後3時48分
CONTROL SYSTEMS
13) Remove the spring pin, and then remove the
bushing and snap ring.
(A) Bushing
(B) Snap ring
14) Remove the bushing and spacer from the boss.
(B)
(A)
(A) Bushing
(B) Spacer
15) Remove the bushing and cushion rubber from
the stay.
(B)
(A)
(A) Bushing
(B) Stay
(C) Cushion rubber
MT Gear Shift Lever
D: ASSEMBLY
1. 5MT
NOTE:
• Clean all the parts before assembly.
• Apply
003603001) or equivalent] to each part.
1) Mount the bushing and cushion rubber to the
(B)
stay.
(A)
CS-00237
(A)
2) Install the bushing and spacer to boss.
CS-00238
(C)
3) Using new self-locking nuts, install the boss to
the joint.
Tightening torque:
CS-00239
CS-40
grease
[KOPR-KOTE
(A)
(A) Bushing
(B) Cushion rubber
(B)
(A)
(A) Bushing
(B) Spacer
12 N·m (1.2 kgf-m, 8.9 ft-lb)
(Part
No.
(B)
CS-00061
(A)
CS-00238
CS-00322