Subaru IMPREZA GD 2007 Series Manual page 2981

Table of Contents

Advertisement

asieps_tobira_IM_US.book 76 ページ 2012年1月17日 火曜日 午後3時48分
MANUAL TRANSMISSION AND DIFFERENTIAL
14) Install the 5th needle bearing and 5th drive
gear.
(B)
(A) 5th needle bearing
(B) 5th drive gear
15) Install the 5th baulk ring.
16) Install the 5th-6th hub.
(1) Being careful of the install direction of the
5th-6th hub, set to the main shaft.
(A) Main shaft
(B) 5th-6th hub
(C) 5th drive gear
Main Shaft Assembly
ST1 18651AA000 INSTALLER
ST2 398177700
CAUTION:
Do not apply pressure in excess of 40 kN (4.0
ton, 4.4 US ton, 3.9 Imp ton).
(A)
NOTE:
When pushing into the 5th-6th hub, move the outer
baulk ring to match the protrusion of the outer baulk
ring and the cut out on the 5th-6th bushing.
MT-00568
MT-00569
(A)
(B)
17) Make sure that the 5th drive gear can be turned
(C)
smoothly by hand. If it does not turn smoothly, re-
assemble.
MT-00570
6MT-76
(2) Using the ST, push into the 5th-6th hub.
INSTALLER
(C)
(D)
(A) 5th-6th hub
(B) Outer baulk ring
(C) Cut out on the 5th-6th hub
(D) Protrusion of the outer baulk ring
ST1
(A)
ST2
(A)
(B)
MT-00571

Advertisement

Table of Contents
loading

This manual is also suitable for:

Impreza gg 2007 series

Table of Contents