Subaru IMPREZA GD 2007 Series Manual page 2604

Table of Contents

Advertisement

asieps_tobira_IM_US.book 97 ページ 2012年1月17日 火曜日 午後3時48分
10) Insert the input shaft, and check the amount of
protrusion.
NOTE:
Turn the input shaft lightly by hand while inserting.
Normal protrusion amount A:
50 — 55 mm (1.97 — 2.17 in)
A
11) Install the torque converter clutch assembly.
<Ref. to 4AT-69, INSTALLATION, Torque Convert-
er Clutch Assembly.>
12) Install the transmission assembly to the vehi-
cle. <Ref. to 4AT-39, INSTALLATION, Automatic
Transmission Assembly.>
C: DISASSEMBLY
1) Flatten the lock nut tab, and then remove the
lock nut while holding the rear spline part of the
shaft using ST1 and ST2. Pull out the drive pinion
collar.
ST1 498937110
HOLDER
ST2 499787700
WRENCH
ST3 499787500
ADAPTER
ST3
2) Remove the O-ring.
Drive Pinion Shaft Assembly
AT-02384
ST2
ST1
AT-00197
4AT-97
AUTOMATIC TRANSMISSION
3) Separate the roller bearing and outer race from
shaft using a press.
(A) Outer race
4) Separate the front roller bearing from shaft using
a press and ST.
ST 498517000
REPLACER
(A)
(A) Front roller bearing
(A)
AT-00198
ST
AT-00199

Advertisement

Table of Contents
loading

This manual is also suitable for:

Impreza gg 2007 series

Table of Contents